Friday, May 27, 2011


The contractor has finished the installation of the overflow sanitary
sewer pipe on Arbor Lane from Cunliff Park to Glenview Road using the
guided bore method. Next week they will be installing 2 deep manholes
across the intersection of Glenview Road and Arbor south of Glenview Rd.
Access in and out of Arbor will be limited. Residents may want to park
on Beaver during daytime hours. The contractor is scheduled to work on
the installation of the sanitary sewer on Glenview Road between Arbor
Lane and Harms Road.

The concrete contractor is scheduled to finish the curb and gutter
replacement on Arbor Lane from Glenview Road to Willmette Avenue this
week. Driveway access to these homes is scheduled to be restored next
week.

Monday, May 9, 2011

The contractor will have one crew working on the installation of the overflow sanitary sewer pipe on Arbor Lane from Cunliff Park to Glenview Road this week using a guided bore method. The guided bore method is used to minimize disturbance to the roadways, driveways and parkways.

The contractor will have a second crew which will start with replacement of water services on Arbor Lane from Glenview Road to Wilmette Avenue. There will be an occasion when the resident’s water service will be shut off for a few hours when the contractor is replacing the individual resident’s water service. The contractor will knock on doors before shutting off the resident’s water service.

Saturday, April 30, 2011

The contractor will have one crew continue with the installation of the overflow sanitary sewer pipe on Arbor Lane from Glenview Road to Wilmette Avenue into next week.

The contractor has added a second crew which will continue with the installation of the overflow sanitary sewer pipe through Cunliff Park and work northbound on Arbor Lane up to Glenview Road into next week.

Thursday, April 21, 2011

The contractor installed a deep manhole at the intersection of Glenview Road and Arbor Lane this week. The contractor will continue with the installation of the overflow sanitary sewer pipe on Arbor Lane from Glenview Road to Wilmette Avenue into next week. Additionally, mid-to-late next week the contractor will bring in a second crew to begin sanitary sewer installation in Cunliff Park. The sanitary sewer work in Cunliff Park begins approximately 300 feet south of Arbor Lane and continues north into the east parkway of Arbor Lane.

Friday, April 15, 2011

Dimeo Bros. has completed directional drilling the water main on Arbor Lane between Glenview Road and Wilmette Avenue.

The contractor for the construction work, DiMeo Brothers, has notified the Village of Glenview that they plan on starting the sanitary sewer installation on Arbor Lane from Glenview Road to Wilmette Avenue next week either Tuesday or Wednesday, weather permitting. This work will necessitate the closure of the intersection of Arbor Lane at Glenview Road and residents should access their homes via Wilmette Ave. The westbound lane of Glenview Road will be closed while working at the intersection and flaggers will be on site to allow two-way traffic on Glenview Road during working hours. Work at the intersection will take 2 to 3 days. From there they will continue north towards Wilmette Avenue. This sewer work will bring a lot of truck traffic to the street so please be cautious while driving. The contractor will also be posting no parking signs for daytime working hours.

The contractor is also scheduled to complete spot repairs to the sanitary sewer along Arbor Lane from Glenview Road to Wilmette Avenue next week.

Friday, April 8, 2011

Dimeo Bros. has completed directional drilling the water main on Arbor Lane between Glenview Road and Wilmette Avenue. DiMeo Bros. will now begin installing new fire hydrants and valves in vaults. Filling and flushing of the water main will be completed and then pressure testing and chlorinating. It is anticipated that water service connections to each home will commence the following week.

Friday, April 1, 2011

DiMeo Bros. has started directional drilling the water main on Arbor Lane between Glenview Road and Willmette Avenue. DiMeo Bros. will continue with the directional drilling of the water main on Arbor Lane between Glenview Road and Willmette Avenue for the next two weeks.