Friday, September 30, 2011

Next week, the electrical contractor is scheduled to continue wiring for the sanitary lift stations at Cariann Lane and Arbor Lane. On Cariann Lane, the concrete contractor is scheduled to begin installation of curb with the paving contractor scheduled to begin paving shortly after the curb installation.

Additionally, the paving contractor is scheduled to begin grinding the pavement on Arbor Lane in preparation for asphalt paving.

Friday, September 23, 2011

Next week, DiMeo Bros. is scheduled to continue piping within the sanitary lift station at Cariann Lane. Additionally, late next week the asphalt contractor will be grinding Arbor Lane from Glenview Road to Wilmette Avenue in preparation for asphalt resurfacing.

Friday, September 16, 2011

Next week, DiMeo Bros. is scheduled to continue work on the sanitary lift station at Cariann Lane.

Friday, September 9, 2011

Next week, DiMeo Bros. is scheduled to continue work on the sanitary lift station at Cariann Lane.

Friday, September 2, 2011

Next week, DiMeo Bros. is scheduled to continue work on the sanitary lift station at Cariann Lane. Also next week, DiMeo Bros. is looking to begin curb and gutter and sidewalk restoration on Cariann Lane and along East Lake Avenue from Cariann Lane to Sherwood Road.